The National Aeronautics and Space Administration (NASA) has unveiled a $20 billion, 3-phased plan to establish a permanent lunar base equipped with rovers and drones.
The plan aims to set up the base by March 2027, with the objective of landing astronauts on the moon in 2028. The mission is structured into 3 phases: Moon Base-I (2026-2028), Moon Base-II (2029-2032), and Moon Base-III (2032 onwards).